
Project Showcase

Melaka Highway Drainage Upgrade: Resilient Infrastructure & Flood Mitigation on FT143 Highway
Lebuh Raya Ayer Keroh, Melaka
Construction Date
Project Client
Cost Value
:
:
:
30-03-2022
Selia Selenggara Selatan Sdn Bhd
RM487,148.31
Horizon Dig Technology Sdn Bhd recently completed a critical oil and gas pipeline installation project in Melaka, Malaysia, showcasing our exceptional logistical efficiency and adaptability in challenging environments. This undertaking involved precision boring works for large-diameter pipelines within a highly congested industrial corridor, contributing significantly to the reliability of Malaysia's energy supply infrastructure.
Advanced Stormwater Management & Culvert Installation
The core scope involved the precise installation of new culverts and the construction of advanced stormwater management structures. These elements are integral to preventing and mitigating the severe impact of floods, ensuring the FT143 highway remains a reliable route for traffic flow even under challenging weather conditions. Our methods contributed to the broader goal of sustainable infrastructure project design.
At Horizon Dig Technology, our commitment to excellence is amplified by our strategic integration of advanced intelligence. We continuously analyze data to optimize our engineering solutions, enhance the efficiency of heavy machinery transport routes, and perform precise evaluations for machinery sales. This data-informed approach ensures superior project delivery in pipe jacking, underground construction, and all our specialized services across Johor and Malaysia, positioning us at the forefront of the industry's technological evolution.